NobleBlocks

Research indexJournal article

Parallel two-processor scheduling for interval ordered tasks

Chung, Kwon

1 Jan 2000

NobleIDark:/48914/w1/20260521/E79838FBDOI10.1109/hpc.2000.846561

Paywalled

The full text is at the publisher

You can read the abstract here, or open it at the publisher.

Read at the publisher

Abstract

Shows that the problem of scheduling n unit-length tasks on two identical processors, for the case where the precedence constraint is an interval order, can be solved in O(log/sup 2//spl nu/+(n log n)//spl nu/) time with O(n/spl nu//sup 2/+n/sup 2/) operations on a CREW PRAM, where /spl nu//spl les/n is a parameter. By choosing /spl nu/=/spl radic/n, we obtain an O(/spl radic/n log n)-time algorithm in O(n/sup 2/) operations. For /spl nu/=n/log n, we have an O(log/sup 2/n)-time algorithm in O(n/sup 3//log/sup 2/n) operations. The best previously-known solution takes O(log/sup 2/n) time with O(n/sup 3/ log/sup 2/n) operations on a CREW PRAM. Our improvement is mainly caused by reducing the two-processor scheduling problem for interval orders to that of finding a maximum matching in a convex bipartite graph, which is a new approach.

Discussion

Citations

Topics

More

Suggest a correction or report