Research indexJournal article
ОПТИМИЗАЦИЯ ТЕХНОЛОГИЧЕСКИХ ПАРАМЕТРОВ ПРОВЕДЕНИЯ РЕМОНТНО-ИЗОЛЯЦИОННЫХ РАБОТ ПО ОТКЛЮЧЕНИЮ ОБВОДНЕННЫХ ИНТЕРВАЛОВ ПЛАСТА ТАМПОНИРОВАНИЕМ
Шагалин, Мерзляков
Нефтегазовое дело18 Jun 2015
NobleIDark:/48914/w1/20260515/FCD04CB7DOI10.17122/ngdelo-2015-2-74-79
ОПТИМИЗАЦИЯ ТЕХНОЛОГИЧЕСКИХ ПАРАМЕТРОВ ПРОВЕДЕНИЯ РЕМОНТНО-ИЗОЛЯЦИОННЫХ РАБОТ ПО ОТКЛЮЧЕНИЮ ОБВОДНЕННЫХ ИНТЕРВАЛОВ ПЛАСТА ТАМПОНИРОВАНИЕМ
Шагалин, Мерзляков · Нефтегазовое дело · 2015 · Subscription
NobleIDark:/48914/w1/20260515/FCD04CB7DOI10.17122/ngdelo-2015-2-74-79
The full text is at the publisher
You can read the abstract here, or open it at the publisher.
Abstract
Continuous operation of wells of Arlanskoye field at high water content becomes unprofitable. In order to reduce water production, isolating and repair works are required. Available production procedures for isolating and repair works performance mainly represent outline recommendation on field-geologic parameters of bottom-hole formation zone, determination of volumes of cement slurry compositions, selection of patterns and pressure of injection. Generalization and statistical analysis of results of isolating and repair works performed by plugging with use of synthetic resins make possible to specify conditions for their effective application. Analysis and statistical processing of data on degree of water output reduction and oil production increase, on technological parameters of injection of cement slurry based on resins КФ-Ж and Resoil K-1 as well as multiparameterregression equations are obtained for prediction of repair and isolating works efficiency when shutting-in watered formation intervals with relation to water output reduction and well support load decrease. For estimation of the model regression coefficients a module called “fixed nonlinear regression” of statistical packet STATISTICA-6 is used. Prediction of decrease of water output degree after performance of repair and isolating works can also be carried out while operating similar objects of development at other oil fields. Alongside with a possibility of forecasting of efficiency of isolating and repair works performed in a specific well, the results of the analysis provide optimization of technological parameters when carrying out these works. In presence of initial information on geological and geophysical parameters of bottom-hole formation zone and well operation characteristics (q ж h эф), it is possible to carry out point correction of repair and isolation work performance parameters. This kind of optimization of repair and isolation works makes possible to reduce costs and increase economical efficiency.