Research indexJournal article
Updating a steel mill power system to improve reliability and decrease energy costs
Albaugh, Kornblit
30 Dec 2002
NobleIDark:/48914/w1/20260521/07BEBA89DOI10.1109/ias.1993.299219
Updating a steel mill power system to improve reliability and decrease energy costs
Albaugh, Kornblit · 2002 · Subscription
NobleIDark:/48914/w1/20260521/07BEBA89DOI10.1109/ias.1993.299219
The full text is at the publisher
You can read the abstract here, or open it at the publisher.
Abstract
The authors provide insight into the planning and implementation of several significant cost saving and reliability improvements at a turn-of-the-century steel mill in Ohio. A number of target areas needing attention were identified. These included the cost of electrical energy, the cost to manufacture oxygen inhouse, and the need to accommodate future modernization projects. An option also under consideration included possible elimination of the oxygen facility if lower-cost oxygen could be purchased from an independent vendor. Preliminary evaluations, plans, and reviews took approximately two years before approval was received to proceed with the main oxygen plant project. Its bidding process and implementation took an additional year. The power system modernization project, which included addition of the power monitoring system, short-circuit retrofit of the 13.8 kV switchgear, distribution transformer isolation capability and two new double-ended low voltage substations took an additional six months.< >