NobleBlocks

Research indexReport

D3.5 SD Tool Initial Prototype

PoliRural

Zenodo (CERN European Organization for Nuclear Research)22 Mar 2021Open access

NobleIDark:/48914/w1/20260525/F54EE8D5DOI10.5281/zenodo.7486974

Abstract

One of the key points in WP5 revolves around SDM modeling as a tool to support foresight. Apart from the specific issues raised in WP5, WP3 is also crucial for the usefulness of the SDM. This document is not about building the operative SD model, but translating and simplifying the technical and conceptual complexity to a level that can be managed by local agents and policy makers. This work started in D3.3 and is to be finished in D3.6, with the important milestone of the prototyping contained in the current deliverable. The base model for the prototype, PoliRural SDM ed.3, is explained in chapter 3, together with the context of the foresight exercise. Chapter 4 deals with the technical process to build the tool, including the realization of concept as explained in D3.3, preprocessing, and execution via web API. The chapter ends with an example to demonstrate how the developed API can be integrated into a HTML5 and Javascript application. Since the beginning of the project the necessity has been signalled to engage a community of stakeholders with a vested interest in following, contributing to and furthering the work done on PoliRural with regards to System Dynamics. To help achieve this goal, point 5 describes the form of a database of local dynamics. Licensing and distribution matters are covered in chapter 6. The section on conclusion and next steps contains a description of the challenges ahead, including functional, organizational, technical and accessibility issues. The document ends up with some considerations about the business sustainability and planning.

Discussion

Topics

More

Suggest a correction or report