Planeamento da operação de centrais hídricas em ambiente de mercado utilizando a função fmincon do MATLAB

de Morais

Open Repository of the University of Porto (University of Porto)20 Feb 2015Open access

NobleIDark:/48914/w1/20260515/9403CE69DOI10.34626/d0dp-gc10

Abstract

The electricity sector has suffered important changes in recent years. The introduction of electricity markets led to a restructuration of a sector, that was always very traditional, transforming a centralized structure in a disaggregated structure. Despite the fact that Portugal has a high hydroelectric potential, only 50% of it is being currently explored, making the country dependent of the imported fossil fuels. The need to reduce this dependency and the desire to explore all of the hydroelectric potential, led to a boosting in the investment of new hydroelectric power plants, to the reinforcement of the installed capacity and in studies to optimize the operational planning of these hydroelectric power plants. However, the optimization of the operational planning of hydroelectric power plants is a complex problem, due to the non-linear relation between the power, the head and the flow of a hydroelectric power plant, as well as the hydro interdependency between them. Other factors can hinder this task, such as the possibility of having reversing groups, the uncertainty about the natural inflows, and the fact that operational decisions taken in the present will affect the system operation in the future. This work aims to implement an optimization model based on the MatLab function fmincon, to determinate an estimate of the remuneration of hydros power plants, through the optimization of their operation in a market environment. Using as an input the number of hydroelectric plants and the number of periods, as well as the structure of the hydro system, the inflows and other technical characteristics of the units, the model should give as an output the most adequate periods for water usage to generate electricity, and the most adequate periods for the usage of electricity to pump the water downstream to upstream, in order to maximize the profits. Our approach was applied to a test case, with data provided by EDP Producao, based in the Portuguese Douro River cascade, for a time period of 24 hours. The results show that the method selects the periods with the higher market prices to generate electricity, and the periods where the market prices are lower to pump the water. This was the expected behavior in order to maximize the remuneration of hydro power plants. However, although the problem can be solved using fmincon MatLab function, it presents high processing times as the number of hydroelectric plants increases. On the other hand, the final solution depends on the selected initial point in the sense that some initial solutions can lead the algorithm to identify local optimum.

Discussion

Citations

Topics

More

Suggest a correction or report