NobleBlocks
Public

Βραχυπρόθεσμος προγραμματισμός παραγωγής για το σύστημα ηλεκτρικής ενέργειας της Κύπρου

Published in University of Thessaly Institutional Repository (University of Thessaly) • Jan 1, 2011
NobleIDNI2P13W96R65S47
Authors:
Παναγιώτης Ε. Ανδριανέσης

Abstract

In the present master thesis, the short-term generation scheduling problem for the electrical power system of Cyprus is defined, modeled, and solved.Initially, the electrical power system of Cyprus is described, with particular emphasis on the electricity generation sector.Furthermore, the mathemati...

Finding related papers...

Discussions

(0)

No comments yet

Be the first to share your thoughts!